Line 44: Line 44:
 
**B0000G_C longitudinal at centerline
 
**B0000G_C longitudinal at centerline
 
**B0500P-LG01 portside longitudinal at 500mm from CL
 
**B0500P-LG01 portside longitudinal at 500mm from CL
**B0750S-LG03 starboard longitudinal at 750mm from CL
+
**B0500P-LG01_M starboard longitudinal at 500mm from CL, mirrorwise with portside
 +
**B0750S-LG03 starboard longitudinal at 750mm from CL, non-mirrorwise with portside
 
**B0200-0500P-LG05 skewed portisde longitudinal between B200 and B500
 
**B0200-0500P-LG05 skewed portisde longitudinal between B200 and B500
  
Line 60: Line 61:
  
 
*For plate expansion use the Hull file name with CRV- added in front '' - for example CRV-SHELL''
 
*For plate expansion use the Hull file name with CRV- added in front '' - for example CRV-SHELL''
*For shell stringers use the Hull file name with SS- add in front '' - for example SS-STRINGERS
+
*For shell stringers use the Hull file name with SS- add in front '' - for example SS-STRINGERS''
''
 
  
 
[[Category: File Management]] [[Category: ShipConstructor]]
 
[[Category: File Management]] [[Category: ShipConstructor]]

Revision as of 10:51, 10 September 2009

ShipConstructor Hull

EXPANSION DRAWINGS

Depending on the size and complexity of the project we distinguish 3 different levels in expansion drawings:

  • Level 1 all curved plates in 1 drawing, all stringers in 1 drawing
    • SHELL
    • STRINGERS expanded stringers


  • Level 2 curved plates split in 2 drawings, stringers split in 2 drawings
    • HULL
    • SUPERSTRUCTURE
    • STRINGERS-HULL expanded stringers hull
    • STRINGERS-SUPERSTRUCTURE expanded stringers superstructure
  • Level 3 curved plates and stringers split in several drawings
    • HULL
    • BOTTOM
    • SPRAYRAIL
    • SIDE
    • RANSOM
    • APPENDAGES keels, shaft struts, etc.
    • DECK
    • SUPERSTRUCTURE

ShipConstructor Structure

PLANAR GROUP NAMES

  • Frame
    • FR02 full frame
    • FR02+050 intermediary frame at 50mm forward of frame 2

NOTE distances are always measured positive, forward of a frame (except for F00) Use 2 digits for frame number, 3 digits for intermediary distance


  • Longitudinal
    • B0000G_C longitudinal at centerline
    • B0500P-LG01 portside longitudinal at 500mm from CL
    • B0500P-LG01_M starboard longitudinal at 500mm from CL, mirrorwise with portside
    • B0750S-LG03 starboard longitudinal at 750mm from CL, non-mirrorwise with portside
    • B0200-0500P-LG05 skewed portisde longitudinal between B200 and B500

Use 4 digits for buttock distance, 2 digits for LG number


  • Deck
    • W2500-DK01 deck at W2500 (2500mm above baseline)
    • W0200-0500-DK03 skewed deck between W200 and W500
  • Use 4 digits for waterline distance, 2 digits for DK number


CURVED PLATE GROUP NAMES

  • For plate expansion use the Hull file name with CRV- added in front - for example CRV-SHELL
  • For shell stringers use the Hull file name with SS- add in front - for example SS-STRINGERS