Difference between revisions of "10001 MS Albatros"

From NavykI
Jump to: navigation, search
(To do)
(Sending furniture drawings to Albatros team)
Line 31: Line 31:
 
*update the Albatros drawing list ''(Google document)''
 
*update the Albatros drawing list ''(Google document)''
 
*put PDF on FTP ''(when it concerns an update, delete the old PDF from FTP)''
 
*put PDF on FTP ''(when it concerns an update, delete the old PDF from FTP)''
*send PDF to Joop and CC to Steven - subject ''Albatros - furniture drawing new'' or ''Albatros - furniture drawing update''
+
*send PDF to Ionut Melescanu and CC to Steven - subject ''Albatros - furniture drawing new'' or ''Albatros - furniture drawing update''
*if the drawing has electrical connections / appliances than send PDF + DWG to Ionut Melescanu (contactperson RETEC)
+
*if the drawing has electrical connections / appliances than send also the DWG file to Ionut Melescanu (contactperson RETEC)
 
*print drawing on A4 colour and put in Albatros file
 
*print drawing on A4 colour and put in Albatros file
+
 
 
== Hydrostatics ==
 
== Hydrostatics ==
  

Revision as of 10:33, 22 July 2011

To do

  • ON update weight calculation/hydrostatics for situation at launching
  • drawings:
    • positions window wiper motors + holes superstructure
    • boarding ladder
    • pasarelle - 24V w actuator Length 2-4m
    • opening railing detail
    • SH antenna supports - finalize drawing
    • removable table on windlass gear casing
    • design exterior furniture (chairs foredeck)
    • provisions for lowering mast with their own hoists
    • update GA
    • bilge foreship - frame for storage boxes
    • sole - add hatches inside WH console
  • spreader lights - Aqua Signal Lubeck

Hotwork to be done

  • ER air intakes - drains?
  • ER air intakes - fire damper
  • halyard winches compartment - drain?
  • funnel - L-profile firedamper + support morse cable
  • aftdeck - shower?
  • flagpole - support
  • lifebuoys - supports
  • crew entrance - door hinges

Sending furniture drawings to Albatros team

  • remove WIP from the file name
  • make the drawing 'read only'
  • update the Albatros drawing list (Google document)
  • put PDF on FTP (when it concerns an update, delete the old PDF from FTP)
  • send PDF to Ionut Melescanu and CC to Steven - subject Albatros - furniture drawing new or Albatros - furniture drawing update
  • if the drawing has electrical connections / appliances than send also the DWG file to Ionut Melescanu (contactperson RETEC)
  • print drawing on A4 colour and put in Albatros file

Hydrostatics

launching 8 july 2011

  • 62 tons - weight in crane
  • Waterline measurements:
    • Fore-> 340mm under the XVI draft mark
    • Aft -> 360mm under the XX draft mark