Difference between revisions of "Systems matrix"

From NavykI
Jump to: navigation, search
(New page: optimum engine room layout including optional equipment considering: *weight *routing *access *steel penetrations furtermore *part list *1 central file for all related info *gain a quick ...)
 
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
 +
For a further development see [[Centralizer]].
 +
 
optimum engine room layout including optional equipment
 
optimum engine room layout including optional equipment
 
considering:
 
considering:
Line 12: Line 14:
 
*all required info for starting system engineering in SC
 
*all required info for starting system engineering in SC
  
 +
 +
orderlist
 +
*per supplier for each part total quantity (by means of an automatic filter function?)
  
 
[[Category: Systems]]
 
[[Category: Systems]]

Latest revision as of 09:40, 18 February 2012

For a further development see Centralizer.

optimum engine room layout including optional equipment considering:

  • weight
  • routing
  • access
  • steel penetrations

furtermore

  • part list
  • 1 central file for all related info
  • gain a quick overview of required building kit penetrations
  • all required info for starting system engineering in SC


orderlist

  • per supplier for each part total quantity (by means of an automatic filter function?)