Difference between revisions of "11022 Catfish 46"

From NavykI
Jump to: navigation, search
(40 Construction)
(Building kit)
Line 158: Line 158:
  
 
===== Building kit =====
 
===== Building kit =====
 +
*shower foreship - Patrick mentioned something about the scupper intersecting the construction, I asked him to send pictures but I never received (SH)
 
*deck fills - HIP Ø53?
 
*deck fills - HIP Ø53?
 
*U1-CAB-18P+S - update template names
 
*U1-CAB-18P+S - update template names

Revision as of 09:16, 4 April 2012

Contents

General

Contacts

  • yard Gielissen Linskens
    • T 0031 (0)478 531 935
    • yard project manager - Peter Linskens (does not master English)
      • +31 (0)6 53 86 83 79
    • yard mechanic - Patrick de Bruijn (mail Werkplaats.Wanssum@Gielissen.NL)
    • interior labout preparation
      • Niels van der Rijt (Gielissen Neos, Helmond)
      • +31 (0)492 53 15 31
      • Niels.van.der.Rijt@gielissen.nl
  • designer iYacht
    • Udo A. Hafner
    • e-mail uh@i-yacht.de
    • mobile phone +49.173.2421981

Suppliers

Classification

  • CE-C
  • certification DMI tel +31 597 671 000
    • contactperson Albert de Roos tel +31 61 58 75 825
    • info@dutchmarineinspection.nl

Scope

  • hydrostatics
  • general construction plan
  • construction building kit without
    • bench aftdeck
    • mast
  • systems
  • interior building kit:
    • expansions
    • no hardware list
    • no edging

Drawing list

  • 20-100 midship section
  • 20-200 tank arrangement
  • 40-100 general construction plan
  • 40-110 plate expansions
  • 40-120 bending and forming
  • 40-130 subframe profile report
  • 40-140 subframe assembly drawing
  • 40-150 fresh water tank
  • 40-151 fresh water tank mounting
  • 50-200 welding schedule
  • 50-210 fender plan
  • 50-220 stainless steel
  • 50-230 plywood panels
  • 50-240 waste water tank connections
  • 60-110 diagram fuel
  • 60-120 diagram fresh water
  • 60-130 diagram waste water
  • 60-140 diagram heating
  • 70-100 set up interior

Time schedule

  • wk 1 - plate estimation
  • wk 3 - cutting of steel
  • planning Linskens:
    • 1 month for building in systems + interior
    • 1 month for hull construction

Visualisation

  • printer A3 format
  • DEF format

Issues

  • frame for starterbatteries bends very easy - solve with strip brackets
  • heating - exhaust route to close to fuel tank
  • heating - batteries must be removed in order to connect the exhaust hose to the skinfitting
  • heating - intake silencer - not enough length available (stairs is not excecuted conform our info)

Questions

General

40 Construction

50 Outfitting

60 Systems

70 Interior

  • engine room access - to be considered Wat betreft motorluik kan ik zo niet goed beoordelen. Ben deze week niet op kantoor om tekeningen te beoordelen. Is de ruimte krap of niet toegangkelijk? Kom hier anders volgende week op terug.

80 Insulation

90 Paint and Varnish

To do

Issues

  • system assemblies: how to show systems for different lay out versions?

General

  • DWF model
    • fire fighting - add to 3D model
  • fuel shut off - position in interior
  • engine control - determine lenght of cables + access
  • send construction plans to DMI

System matrix

Organise

  • 3D model layer control (incl. SC)
  • 3D model Xref
  • define clearly what is interior / system / outfitting (for example, toilet is interior appliance but solenoid valve is system)
  • part catalogue (PDF with supplier info of each part for systems?
  • system matrix - create purchase list by means of filtering

20 Naval Architecture

30 3D models

11022-30-100 solid model.dwf
  • update bow thruster tube

40 Construction

40-100 general construction plan
  • add angles to thrustersengines
  • move FW tank 20mm forward (coincides with structure)
40-105 shell penetrations
  • PS view - add X dimensions
  • add additional holes as mentioned for building kit
40-110 plate expansions
40-120 bending and forming
  • U1-CAB-18P - update template names
  • gas locker top is mirrored in nest - swop bending texts
  • transom stairs - step ST-01 - change bending into OR mirror plate in nest (first option is preferred)
  • transom stairs - step ST-02 - change bending into OR mirror plate in nest (first option is preferred)
  • transom stairs - step ST-03 - change bending into OR mirror plate in nest (first option is preferred)
  • transom stairs - step ST-04 - change bending into OR mirror plate in nest (first option is preferred)
  • transom 01P - swop bending info?
40-140 subframe assembly drawing
40-151 fresh water tank mounting
  • move tank 20mm forward (tank coincides with structure)
40-210 fender plan
Building kit
  • shower foreship - Patrick mentioned something about the scupper intersecting the construction, I asked him to send pictures but I never received (SH)
  • deck fills - HIP Ø53?
  • U1-CAB-18P+S - update template names
  • F07+76 - add hole for shaft lubrication hose?
  • F07+76 - add hole Ø100 for technique lines (see mail 26-03)
  • F12 - add hole Ø100 for technique lines (see mail 26-03)
  • F12 - add hole in bhd so shaft can be entered in shafttube from inside (then rudder does not need to be removed)(see mail 26-03)
  • skinfittings - change HIP for plastic models (see system matrix)
  • F23 - add hole for cables
  • engine girders - add threaded holes for engine mounts
  • transom stairs - add hole Ø25 in center of every riser
  • fuel tanks - mark at outside
  • drains SB aft - swop skinfitting of drain unit with skinfitting of wash basin
  • gas locker top is mirrored in nest - swop bending texts
  • shell 04C - split bended corners
  • shell - thrusters only marking
  • fuel tank PS - add hole sensor
  • fuel tank SB - add hole fuel supply

Done

  • F23 - lower horizontal strip for subframe with 3mm for glue
  • replace all FB 80x8 by FB 60x8
  • rename all DECK planar groups (measure from baseline, NOT from waterline)
  • chainlocker drain - deck cutout does not match pipe, change pipe run for clearance with subframe
  • add finish to ALL parts
  • check bending side for ALL parts
  • windows superstructure front - split in different way
  • tanks - split in a different way
  • subframe bolting plates - make correct size
  • thruster fairing - bending info missing
  • fuel tanks - mark baffle plates
  • fuel tank PS - baffle plates - add scallop in upper corner
  • fuel tanks - lug for airvents: change from 1/2" into 3/4"
  • fuel tanks - change fill lug into 1 1/2? (same as on watertank)
  • fuel tanks - change return lug from G3/4 into G1/2
  • fuel tanks - add return lug G1/2 for optional generator in PS tank (position as SB but mirrored)
  • fuel tanks - move return sockets aft?
  • fuel tanks manholes - add bolts + copper washer under bolthead + section with rubber detail
  • shell - mark fender tubes
  • ER air - move aft with 60mm
  • gaslocker/transom - update bending side and angle
  • shell topside - modify cutout for skinfitting gaslocker (Ø27)+ bilge (Ø33)
  • shell topside - part 02+04 change thickness text into -5-
  • rudder indicator - make bracket part
  • CAB-01-C - split at bended corners (change into 3 parts, split at bending line +30, no overlength), update bending drawing
  • CAB-05-C - split at bended corners (change into 3 parts, split at bending line +30, no overlength), update bending drawing
  • F02 + F03 + F04 - split at CL (yard cannot make flanges at this lenght), update bending drawing
  • F02 + F03 + F04 - reduce radius in way of sole to create bigger tolerance (see F01)
  • steeringtable - reduce length
  • thruster bearing plate - mark on engine girders, show in CL section
  • shell topsides - mark gluing strip
  • glue strip PS aft - bollard box extension is missing (SB is correct)
  • flange of windlass base - shorten lower edge with 10mm
  • shell bottom - add hole at PS for bidata
  • shell bottom - add holes for deck drain pipes
  • shell topsides - add additional skinfittings for waste water
  • parts A are nowhere indicated in construction drawings
  • parts B are to be canceled
  • subframe - starter batterie support - add strip bracket fore and aft

Nest

50 Outfitting

  • 11022-50-220-A stainless steel - modify forward railing?

60 Systems

System matrix
  • replace inox skinfittings with plastic skinfittings with inox cover (Osculati) - update shell penetrations?
  • add standard bow/stern trusters + mention optional thrusters
  • single aft cabin - add hot water to washbasin in bathroom PS
Assemblies
  • heating - exhaust is mounted to air intake right now, modify
  • drains SB aft - swop skinfitting of drain unit with skinfitting of wash basin
  • single aft cabin - add hot water to washbasin PS

70 Interior

80 Insulation

Options

  • our delivery must be prepared for the following options:
    • 2 additional batteries of 165 Ah
    • bowthruster 105 kgf
    • sternthruster 105 kgf
    • Webasto air heating
    • deckwash at swimplatform (fresh water)
    • combimicrowave with grill
    • hood

20 Naval architecture

Tank arrangement

  • tanks at CL
  • waste water 215l - Vetus BTANK215
  • fresh water 450l - Vetus or custom made
  • fuel 800l - Vetus or custom made
  • waste water tank in 'engine room'
  • fresh water tank NOT in 'engine room'
  • fresh water tank NOT under beds

30 Propulsion

  • maximum speed 17kmh
  • standard engine is Vetus DT44 - 140hp
  • optional engine is Vetus DT66 - 170hp
  • gearbox
    • DT44 - ZF45 reduction 2.2:1
    • DT66 - ZF45 reduction 1.51/2.03:1
  • stern tube - Exalto weld-in type 22.2, OD Ø95 (HIP Ø100) with 3 doubling tubes which can be ignored for building kit

40 Construction

  • as simple as possible in order to reduce costs of material and manhours
  • use bending parts as much as possible: reduced manhours for welding and painting
  • railing aftdeck - mounted on L80x40, flange up and outward, ends in line with aftcabin contour, ends closed with plates (this will be painted in contrasting colour) - see sketch 1
  • rubrail swimplatform - rubber D-profile mounted on tube OD30 welded at 6mm distance from shell (spacers not in delivery) - see scan stootrand
  • inner transom is a bending part
  • transom stairs - 1 bending part
  • keel and rudder as Catfish 1, unless we can improve it
  • sternthruster model and position as Catfish 1
  • air intake - was the Catfish logo but this might give problems with painting so this will become a simple label (needs to allow a flow of 10-15 m³/min for combustion)
  • airintake - integrate, solution? (purchase part is about €250)
  • bulwark - single plate, tube OD30 on top
  • bulwark iwo bow - continue over CL when doubts about strength - add hole for anchor
  • forepeak bhd - hole for inspection anchor arrangement
  • chain locker - drains to bowthruster
  • chainlocker - no bottom (Forepeak is under the waterline, it will flood)
  • rubrail - not present, striping only
  • bench aft deck - purchase part
  • engine room - as small as possible
  • engine room - not in steel
  • steering console - GRP part
  • escape hatch foredeck - no horizontal base required
  • stern thruster - no hatch in swimplatform required for inspection/removal
  • salon roof - side is a straight bending part, max. length 2000mm, after bending the part it is forced into the desired longitudinal curvature
  • forepeak bhd - access hole chainlocker without steel hatch


Subframe

Function:

  • base for interior construction
  • base for systems installation
  • mounting of interior + systems into hull

Surface model

  • no extended swimplatfrom
  • radius required at corner side/swimplatform to accommodate D-profile (fillet between side and transom, extends to the bottom)
  • foredeck - no hatches
  • bulwark - single plate, continue over bow when doubts about strength
  • bollard boxes - extend to deck
  • hull to be faired where neccessary
  • aftdeck surface - no cut out for bench

Building kit

  • windows - mark, cut or cut with bridges, up to us
  • portholes - partially cut
  • hatches - partially cut
  • salon entry - cut
  • thrusters - partially cut in shell


NOT in building kit
  • foundation optional generator
  • generator exhaust foundations
  • generator waterseparator overboard
  • generator exhaust shell penetration
  • generator start batterie frame
  • frame for optional service batteries
  • exhaust optional heater
  • exhaust shell penetration optional generator


Lifting plan

  • crane
    • longitudinal distance between hooks is 5300
    • transverse distance between hooks is 5000
    • total lifting height of yard crane is 5800

50 Outfitting

  • windscreen - coaming as Catfish1

Window wipers

  • will be mounted in the windscreen glass

Sole supports

  • conform GA, minimum headroom 2.00m net, sloping downward in forecabin
  • stairs - riser 225mm maximum
  • longitudinal rectangular tubes, in cutouts in frames

Windows and hatches

  • exact dimension and position pending on interior
  • drawn is exterior of windowprofile
  • profile overlaps steel by 17mm, HIP is offset of 20mm
  • salon entry - custom purchase part Boomsma

Groundtackle

  • bowrollers at bow
  • standard is a Muir manual operated windlass with separate chain pipe
  • optional is a Lewmar electrical operated windlass with integrated chain pipe

Bollards

  • screwed on

Thrusters

  • bow thruster greasing reservoir position(needs to bee DWL+500)

Rudder installation

  • manual override by means of square head at rudder shaft
  • rudder arm Vetus HELM40

Deck fills

  • deck fills - in side decks, fresh water on one side, fuel on the other side (respect distance between deckfills conform CE)

Deck drains

  • tube OD 60.3x2.9 R76 (at CL)

Engine room ventilation

  • grill - Vetus Air suction vent type ASV/SSV/SSVL size 80 - HIP 640x139 (free flow area 0.0321m2)
  • dorade box - plywood

Shaft installation

  • water lubrication - closed system (water taken from water injection of engine exhaust)

Cabrio hood and bimini

  • min headroom 1900mm (if possible 2000mm)
  • frame - bending radius 75mm (center of pipe)
  • supplier for frame fittings: Trisco

60 Systems

  • standard engine is Vetus DT 44
  • optional engine is Vetus DT 66
  • see Excel sheet 'catfish techniek'
  • electric switch panel 230V/24V Busch-Jaeger - not in our scope
  • optional heating (air) will be implemented in kit

Bilge

  • overboard in side, above WL
  • pump Rule 1100/24V (instead of Rule 1500 as in yard listing)
    • capacity 70 l/min.
    • pump Ø60.3
    • hose Ø28

Exhaust system

Main engine
  • engine DT 44 - Ø90 PS
    • st.st. elbows 90x2.0xR114.5 (Exalto 560090)
    • minimum bending radius for exhaust hose Ø90 DG rubber is 90mm (Vetus is 135mm)
  • engine DT 66 - Ø125 PS - not in delivery
  • waterlock - Exalto GRP waterlock vertical, dimensions for Ø90 and Ø125 are the same
  • muffler Vetus MP90 - canceled
  • gooseneck - steel tube welded in hull, penetration in way of engineroom
Generator
  • generator Onan - Ø ?

Bow and stern thrusters

  • tube Ø250 standard in boat, thrusters are optional

Cooling

  • engine connections
    • DT 44 -
    • DT 66 -

Fuel

Fresh water

  • fresh water tank custom made by Plastipro
    • construction is corner to corner
    • wall thickness is 10mm
    • they weld sockets with female thread
    • they can make suction pipe
    • they can make mounting brackets
    • for deckplates see Armstrong
  • expansion tank 5 liter
  • fresh water deck wash is on PS

Waste water

  • shower drain - skinfitting with hose Ø25
  • collection boxes - 2 units are required instead of 1 as mentioned in yard purchase list
  • NO direct overboard in system
  • toilets
    • breathers with plastic skinfitting - hole drilled by yard (not in building kit)
  • tank Vetus BTANK215 has a dop Ø62 in the top at 115mm from the front and 630mm from the right side

HVAC

Heating

  • supply air (circulation):
    • salon 1x Ø80mm fixed
  • exhaust grills:
    • 2 aft cabins: 1x Ø70mm closing OR 1 aft cabin: 2x Ø70mm closing
    • 4 bathrooms: 1x Ø70mm closing
    • salon: 2x Ø70mm closing
    • galley: 1x Ø80mm fixed in bench and 1x Ø80mm closing in galley cabinet
    • fore cabin: 1x Ø70mm closing

Electric

  • boardsystem is 24V
  • starter batteries
    • ME DT 44 - 2x 108Ah (12V)
    • ME DT 66 - min. 2x 66Ah - max. 2x 110Ah (24V?)
  • service batteries - 4x 165Ah
  • optional service batteries - 4x 165Ah
  • NO battery boxes
  • navigation lights
    • Osculati 'Classic 12' series (see mail 17-01-2012)

70 Interior

Joinery entry

Clearance

Styling

Lay out

Lay out variations
  • owners version: aft cabin with double bed, separate toilet with sink on PS and large shower on SB
  • rental version: double aft cabin with 2x 2 single beds, each with enclosed bathroom with toilet and shower

Hardware and fittings

Materials

  • 08-MDF-HPL/HPL - draw 10
  • 16-MDF-HPL/HPL - draw 18
  • 09-BIR-HPL/HPL - draw 11
  • 18-FIN-PF/PF - draw 19
  • 18-FIN-HPL/HPL - draw 20
  • 4mm Skai

Prices

  • birch plywood 13-14 €/m2
  • sandwich is about double the price of birch:
    • sandwich 18mm 25 €/m2
    • sandwich 30mm 32-33 €/m2

Sole

  • 18-FIN-HPL/HPL - draw 20
  • on 4mm foamstrips

Appliances

  • finish is HPL except window box which will be Sky
  • materials
    • basewood/shell covering - plywood ocoume
    • furniture - MDF + HPL
    • ? - birch plywood
    • Corian soles in wet units
  • wet units as Centreboard OR glassfibre
  • dinette's - rectangular, purchase parts, not to intersect shell
  • cabin doors - honeycomb with wooden insert at hinge side + HPL / ABS
  • cabinet closing device - push button latch Southco

Washbasin

80 Insulation

  • thermal - 80mm Rockwool
  • ER sound - 30mm from Merford