Difference between revisions of "Drawing categories"

From NavykI
Jump to: navigation, search
 
(3 intermediate revisions by 3 users not shown)
Line 21: Line 21:
 
|-
 
|-
 
|40-100 || General construction Plan
 
|40-100 || General construction Plan
 +
|-
 +
|40-200 || 3D Solid Model
 
|-
 
|-
 
|50 ||Outfitting
 
|50 ||Outfitting
Line 30: Line 32:
 
|70 ||Interior
 
|70 ||Interior
 
|-
 
|-
|80 ||Insulation
+
|80 ||Insulation, paint and varnish
 
|-
 
|-
|90 ||Safety
+
|90 ||Class and Safety
 
|}
 
|}
  
[[Category: File Management]]
+
These codes should be used only for drawings which are destinated for sending to the client. All other drawings should have only projectnumber + groupnumber (for example: 11022-50 set up railing plan). This way it will be easier to keep track of files (and they can be selected far more easy for transfering them on FTP)
 +
 
 +
[[Category: File Management]] [[Category: Drafting]]

Latest revision as of 08:04, 12 October 2012

10 General arrangement
10-010 Concept
10-100 General arrangement
10-900 Notes
20 Naval architecture
20-100 Linesplan
20-110 Surface model
20-200 Tank arrangement
30 Propulsion (motor and sail)
40 Construction
40-100 General construction Plan
40-200 3D Solid Model
50 Outfitting
50-100 Detail construction Plan
60 Systems
70 Interior
80 Insulation, paint and varnish
90 Class and Safety

These codes should be used only for drawings which are destinated for sending to the client. All other drawings should have only projectnumber + groupnumber (for example: 11022-50 set up railing plan). This way it will be easier to keep track of files (and they can be selected far more easy for transfering them on FTP)