Difference between revisions of "13006 Floating 44"

From NavykI
Jump to: navigation, search
(Construction)
Line 18: Line 18:
 
*watertight hulls to be divided in several compartments (damaged stability)
 
*watertight hulls to be divided in several compartments (damaged stability)
 
*4 lifting eyes (crane hooks are at corners L5000xB5250)
 
*4 lifting eyes (crane hooks are at corners L5000xB5250)
 +
  
 
== Construction ==
 
== Construction ==
Line 26: Line 27:
 
*try to get the deck planking in line with top of sandwich sole
 
*try to get the deck planking in line with top of sandwich sole
 
*deck must have provisions for mounting wooden skirting
 
*deck must have provisions for mounting wooden skirting
 +
  
 
== Systems ==
 
== Systems ==
 
*waste water pipe through deck construction to foreship, no draining angle required
 
*waste water pipe through deck construction to foreship, no draining angle required
*waste water system
+
*waste water system: German BusseMF or a Dutch alternative
  
  

Revision as of 08:58, 25 February 2013

General

  • dislacement 12500 kg
  • COG is forward due to heavy large glass windows
  • classification: CE-C (DMI?)
  • boat might sail on salt water too
  • waste water tanks in foreship
  • 2 versions:
    • non sailing (standard)
    • sailing (optional) with outboard engine support
  • aftship:
    • non watertigt space
    • as large as possible
    • space for optional FW tanks and batteries (sailing version)
    • access via hatch in aftdeck
      • hatch is bolted in standard non sailing version
      • hatch is easy removable in optional sailing version
  • watertight hulls to be divided in several compartments (damaged stability)
  • 4 lifting eyes (crane hooks are at corners L5000xB5250)


Construction

  • de Sluis Jachtbouw will do the construction
  • for transport hulls + deck must be <3000mm width (hulls are each 1500mm wide)
  • deck will be assembled at Linskens yard (welded connections)
  • superstructure will have a self supporting sandwich sole of 150mm thickness
  • try to get the deck planking in line with top of sandwich sole
  • deck must have provisions for mounting wooden skirting


Systems

  • waste water pipe through deck construction to foreship, no draining angle required
  • waste water system: German BusseMF or a Dutch alternative


Questions

  • bowthruster?
  • supplier waste water system?
  • add passengers to displacement weight?
  • thickness of deck planking?

Examples