Difference between revisions of "New office"
From NavykI
(→power, lighting, heating, alarms) |
|||
Line 32: | Line 32: | ||
== power, lighting, heating, alarms == | == power, lighting, heating, alarms == | ||
*integrate and monitor everything, make it readable on Android: | *integrate and monitor everything, make it readable on Android: | ||
− | **climate (heating/cooling, humidity, ventilation) | + | **climate (heating/cooling, humidity, ventilation (separate for server room)) |
**lighting | **lighting | ||
**access alarm | **access alarm | ||
**fire alarm | **fire alarm | ||
+ | **power consumption | ||
== to investigate == | == to investigate == |
Revision as of 07:38, 16 May 2013
- open lay out
- good climate control
- good acoustics [modular ceiling with sound absorbatnt tiles w=0.65 C class]
- pleasant environment (light, colors, plants)
- glass partitions for:
- office SH/MH
- meeting rooms
- plotter room
- canteen:
- coffee machine
- water dispenser
- hot and cold running water
- fridge
- microwave
- dishwasher
- optional instruction room (large meeting room)
- server room
- store
- archive adiministration
- protocol
- hardware
- garderobe
- cleaning locker
- bathroom men
- bathroom ladys
- massage room:
- music system
- vanity
- changing rooms (1x masseur, 2x clients)
- ID access cards
power, lighting, heating, alarms
- integrate and monitor everything, make it readable on Android:
- climate (heating/cooling, humidity, ventilation (separate for server room))
- lighting
- access alarm
- fire alarm
- power consumption
to investigate
- solar panels
- solar boiler