Difference between revisions of "14023 Floating 44"
From NavykI
(Created page with "*Goal is to reduce costs of labour and/or material with € 4.000 minimum. *FEM calculations for the following: **hulls # existing hull in 3mm # existing hull in 3mm with deck...") |
|||
Line 1: | Line 1: | ||
− | *Goal is to reduce costs of labour and/or material with € 4.000 minimum | + | *Goal is to reduce costs of labour and/or material with € 4.000 minimum |
*FEM calculations for the following: | *FEM calculations for the following: | ||
**hulls | **hulls |
Revision as of 12:46, 12 May 2014
- Goal is to reduce costs of labour and/or material with € 4.000 minimum
- FEM calculations for the following:
- hulls
- existing hull in 3mm
- existing hull in 3mm with deck 2mm
- existing hull in 3mm with reduced number of watertight bulkheads and with PUR foam
- circular hull in 3mm
- circular hull in 3mm with reduced number of watertight bulkheads and with PUR foam
- platform
- beams with 3mm wall thickness
- reduced number of beams with 3mm wall thickness
- for circular hull:
- maintain platform height
- vary draft
- CE-conformity