Difference between revisions of "15038 Bestevaer 45 ST Pure"
From NavykI
Line 9: | Line 9: | ||
**access bolt connection for mounting superstructure | **access bolt connection for mounting superstructure | ||
**drill holes and notches for assembly | **drill holes and notches for assembly | ||
+ | **heating > add bulkhead penetrations for hose and grills | ||
===Fore Cabin=== | ===Fore Cabin=== | ||
Line 36: | Line 37: | ||
*lining > align knuckles with V-grooves | *lining > align knuckles with V-grooves | ||
− | ===Deck house | + | ===Deck house=== |
*'pillar boxes' to be moved outboard 10mm | *'pillar boxes' to be moved outboard 10mm | ||
*all panels to be white, except for bench fronts, 'pillar boxes' besides entrance and top of guest cabin SB | *all panels to be white, except for bench fronts, 'pillar boxes' besides entrance and top of guest cabin SB | ||
*bench fronts and top of guest cabin to be covered with 6mm bamboo as for entrance doors | *bench fronts and top of guest cabin to be covered with 6mm bamboo as for entrance doors | ||
*add solid profiles around top of guest cabin. | *add solid profiles around top of guest cabin. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==Sheet estimation== | ==Sheet estimation== |
Revision as of 09:50, 11 July 2015
'Pure' is the name of new line of yachts, of which the first boat is named 'Nescio'. This first boat will be build for Eeuwe Kooi himself (owner/director KMY).
Contents
[hide]TO DO
General
- hatch coamings
- port hole boxes superstructure
- leather ceilings
- lining > V-grooves, every 100mm, parallel to deckline/sheer
- access bolt connection for mounting superstructure
- drill holes and notches for assembly
- heating > add bulkhead penetrations for hose and grills
Fore Cabin
- hatches in bed bottom
- battery box
Salon
- pillar mast bulkhead > connected with FB 8mm, split mast bulkhead
- table
- chain plate reinforcement > mask
- lower hinge in forward upper cabinet will be solved by KMY
Galley
- pillar
- re-arrange front drawings to avoid collision with table
- sink > new model?
- fridge > ventilation by holes in locker bottom next to plinth and holes in upper part of PS counter side
Bathroom
- sole detail
- yard will inform if glass doors in bathroom will be applied or not
- material > panels can be normal HPL as rest of boat, the special quality W400-VV is canceled.
Aft cabins
- PS > bulkhead cutout, profiles, raise horizontal profile in line with sole deckhouse
- bed bottoms > hatches for access storage space under, support?
- lining > align knuckles with V-grooves
Deck house
- 'pillar boxes' to be moved outboard 10mm
- all panels to be white, except for bench fronts, 'pillar boxes' besides entrance and top of guest cabin SB
- bench fronts and top of guest cabin to be covered with 6mm bamboo as for entrance doors
- add solid profiles around top of guest cabin.
Sheet estimation
transverse grain
- 17mm single bamboo - 3 sheets - bench fronts SL / galley front / table sides
- 6mm single bamboo - 1 sheet - bench fronts DH
Questions
- General
- corners of plinths above lockers > painted solid?
- bulkhead corners deckhouse?
- lining
- grooves horizontal or parallel to deck?
- distance 100mm?
- Fore cabin
- locker shelf heights adjustable?
- net door width is 500
- Saloon
- details of mast support
- lower hinge in FWD cabinet
- back and side cushions will extend beyond top and front?
- table?
- Galley
- fridge ventilation top?
- pillar position?
- tap cannot be behind sink but will be next to it.
- Bathroom
- wash basin far too big
- furniture material VV too?
- Glass doors?
- Deckhouse
- top is white because we don't have 12mm bamboo
- bench front is large area with only small piece of bamboo visible
- Guest cabin
- storage under bed?
- door rotates inside or outside?
People
- Eeuwe Kooi - director/owner (not directly involved)
- Willem Berends - chain manger (responsible for contract)
- Willem-Jan van der Vegt - engineer (our contactperson)
- Haaie Andringa - foreman carpentry
Exchange work
- KMY negotiated €1.000 discount for delivering a 3D model of interior - send file is only a block file
- integration of heater ducting is not in contract
- info is not delivered on Monday, June 15 but came partially on June 16 and 17
As discussed
July 1, 2015
- furniture doors - 17mm is OK
- entrance hatch recess box - PUR insulated, put plywood panel in front
- stair steps solid wood
- cockpit sole - covered with cork 9mm
- lining - leather panels are canceled
- porthole boxes - yard makes tube, out of our delivery
June 16, 2015
- black water tank - to be determined by Navyk, volume around 50 liter, position SB behind toilet
June 11,2015
- tolerances
- vertical:
- sole to supporting structure - 0mm
- ceiling to structure - 0mm
- horizontal
- clearance from inner frame contour - 20mm (space between frames is reserved for systems)
- vertical:
- insulation type is PUR
- grain orientation will be vertical
- sole supports are alu tube 50x30x?
- cabinet interiors to be white
- KMY workshop facilities:
- no veneer press
- edge band machine for straight edges
- lamello machine
- round router bits R6, R8, R10, R12
- Navyk will route the ducting for airheating through the interior
- Navyk is free to use their own material naming
- Navyk will give a price offer for the aluminium sole supports
Structure model - modifications!
- Forepeak bulkhead - stiffeners will be on aft side (cabin side)
- Pilothouse - between the windows will be a vertical T-profile with a web of 50x6 and a flange of 50x8
- Entrance door forecabin - to be determined by Navyk, it will be a joinery door, not an aluminum door
- sole structure - to be determined, Navyk will make a price offer for this