Difference between revisions of "Centralizer"
From NavykI
Line 6: | Line 6: | ||
Our delivery will be: | Our delivery will be: | ||
− | *construction drawings | + | *construction |
− | *outfitting drawings | + | **drawings |
− | *interior drawings | + | **nesting |
− | * | + | **material reports |
− | ** | + | *outfitting |
− | ** | + | **drawings |
+ | *interior | ||
+ | **drawings | ||
+ | **nesting | ||
+ | **material reports | ||
+ | *systems | ||
+ | **diagrams | ||
+ | **routing/assembly | ||
+ | This should include: | ||
+ | *insulation | ||
+ | *electrics | ||
+ | *classification? | ||
A complete delivery for purchase consists of purchase parts (engine, filters) and make parts (hull, shaft tube). | A complete delivery for purchase consists of purchase parts (engine, filters) and make parts (hull, shaft tube). |
Revision as of 09:34, 18 February 2012
Futher development of the Systems matrix.
The centralizer to be a listing (Excel) of all components required to build a boat.
In short, the client describes or gives a drawing of the boat he wants and Navyk provides all required info for building/assembling this boat.
Our delivery will be:
- construction
- drawings
- nesting
- material reports
- outfitting
- drawings
- interior
- drawings
- nesting
- material reports
- systems
- diagrams
- routing/assembly
This should include:
- insulation
- electrics
- classification?
A complete delivery for purchase consists of purchase parts (engine, filters) and make parts (hull, shaft tube).
Make parts consist of a drawing which indicates exactly what is to be done, it requires all info for making a price offer and producing the part. For a steel hull this means indicating the net and brut steel weight.
Purchase list
- The centralizer generates a purchase list per supplier.
- Usually a boat comes in different versions with several options. In the program you give a build number and choose the version and desired options and then it creates a purchase list per supplier, output in digital format (xls) or PDF.
- The purchase list must be ready to send to the supplier for a price offer.
- Further development is a purchase list for a number of boats, each with it's own configuration.
- Future development: link with client's warehouse adminstration