Difference between revisions of "15038 Bestevaer 45 ST Pure"

From NavykI
Jump to: navigation, search
Line 1: Line 1:
 
'Pure' is the name of new line of yachts, of which the first boat is named 'Nescio'. This first boat will be build for Eeuwe Kooi himself (owner/director KMY).
 
'Pure' is the name of new line of yachts, of which the first boat is named 'Nescio'. This first boat will be build for Eeuwe Kooi himself (owner/director KMY).
  
TO DO
+
==TO DO==
*Marius
+
===General===
**update sheet estimation
+
**hatch coamings
*Steven
+
**port hole boxes superstructure
**drill holes and notches FC
+
**leather ceilings
 +
**lining > V-grooves, every 100mm, parallel to deckline/sheer
 +
**access bolt connection for mounting superstructure
 +
**drill holes and notches for assembly
  
 +
===Fore Cabin===
 +
*hatches in bed bottom
 +
*battery box
 +
 +
===Salon===
 +
**pillar mast bulkhead > connected with FB 8mm, split mast bulkhead
 +
**table
 +
**chain plate reinforcement > mask
 +
**lower hinge in forward upper cabinet will be solved by KMY
 +
 +
===Galley===
 +
*pillar
 +
*re-arrange front drawings to avoid collision with table
 +
*sink > new model?
 +
*fridge > ventilation by holes in locker bottom next to plinth and holes in upper part of PS counter side
 +
 +
===Bathroom===
 +
*sole detail
 +
*yard will inform if glass doors in bathroom will be applied or not
 +
*material > panels can be normal HPL as rest of boat, the special quality W400-VV is canceled.
 +
 +
===Aft cabins===
 +
*PS > bulkhead cutout, profiles, raise horizontal profile in line with sole deckhouse
 +
*bed bottoms > hatches for access storage space under, support?
 +
*lining > align knuckles with V-grooves
 +
 +
===Deck house
 +
*'pillar boxes' to be moved outboard 10mm
 +
*all panels to be white, except for bench fronts, 'pillar boxes' besides entrance and top of guest cabin SB
 +
*bench fronts and top of guest cabin to be covered with 6mm bamboo as for entrance doors
 +
*add solid profiles around top of guest cabin.
 +
 +
   
 +
   
 +
    galley > fridge ventilation by holes in locker bottom next to plinth and holes in upper part of PS counter side
 +
    galley > drawers in front to be moved outboard because now they will hit the table when opening
 +
 
  
 
==Sheet estimation==
 
==Sheet estimation==
 
===transverse grain===
 
===transverse grain===
*17mm single bamboo - 2 sheets - bench fronts SL and galley front
+
*17mm single bamboo - 3 sheets - bench fronts SL / galley front / table sides
 
*6mm single bamboo - 1 sheet - bench fronts DH
 
*6mm single bamboo - 1 sheet - bench fronts DH
  
Line 98: Line 138:
  
  
== 01-Fore Cabin ==
+
 
*hatches in bed
 
*assembly
 
**drillholes
 
**notches
 
*leather ceiling panels
 
*grooves in lining
 
*deck hatch
 
  
  
 
[[Category: Projects]]
 
[[Category: Projects]]

Revision as of 08:48, 11 July 2015

'Pure' is the name of new line of yachts, of which the first boat is named 'Nescio'. This first boat will be build for Eeuwe Kooi himself (owner/director KMY).

TO DO

General

    • hatch coamings
    • port hole boxes superstructure
    • leather ceilings
    • lining > V-grooves, every 100mm, parallel to deckline/sheer
    • access bolt connection for mounting superstructure
    • drill holes and notches for assembly

Fore Cabin

  • hatches in bed bottom
  • battery box

Salon

    • pillar mast bulkhead > connected with FB 8mm, split mast bulkhead
    • table
    • chain plate reinforcement > mask
    • lower hinge in forward upper cabinet will be solved by KMY

Galley

  • pillar
  • re-arrange front drawings to avoid collision with table
  • sink > new model?
  • fridge > ventilation by holes in locker bottom next to plinth and holes in upper part of PS counter side

Bathroom

  • sole detail
  • yard will inform if glass doors in bathroom will be applied or not
  • material > panels can be normal HPL as rest of boat, the special quality W400-VV is canceled.

Aft cabins

  • PS > bulkhead cutout, profiles, raise horizontal profile in line with sole deckhouse
  • bed bottoms > hatches for access storage space under, support?
  • lining > align knuckles with V-grooves

===Deck house

  • 'pillar boxes' to be moved outboard 10mm
  • all panels to be white, except for bench fronts, 'pillar boxes' besides entrance and top of guest cabin SB
  • bench fronts and top of guest cabin to be covered with 6mm bamboo as for entrance doors
  • add solid profiles around top of guest cabin.


   galley > fridge ventilation by holes in locker bottom next to plinth and holes in upper part of PS counter side
   galley > drawers in front to be moved outboard because now they will hit the table when opening
 

Sheet estimation

transverse grain

  • 17mm single bamboo - 3 sheets - bench fronts SL / galley front / table sides
  • 6mm single bamboo - 1 sheet - bench fronts DH

Questions

  • General
    • corners of plinths above lockers > painted solid?
    • bulkhead corners deckhouse?
    • lining
      • grooves horizontal or parallel to deck?
      • distance 100mm?
  • Fore cabin
    • locker shelf heights adjustable?
    • net door width is 500
  • Saloon
    • details of mast support
    • lower hinge in FWD cabinet
    • back and side cushions will extend beyond top and front?
    • table?
  • Galley
    • fridge ventilation top?
    • pillar position?
    • tap cannot be behind sink but will be next to it.
  • Bathroom
    • wash basin far too big
    • furniture material VV too?
    • Glass doors?
  • Deckhouse
    • top is white because we don't have 12mm bamboo
    • bench front is large area with only small piece of bamboo visible
  • Guest cabin
    • storage under bed?
    • door rotates inside or outside?

People

  • Eeuwe Kooi - director/owner (not directly involved)
  • Willem Berends - chain manger (responsible for contract)
  • Willem-Jan van der Vegt - engineer (our contactperson)
  • Haaie Andringa - foreman carpentry

Exchange work

  • KMY negotiated €1.000 discount for delivering a 3D model of interior - send file is only a block file
  • integration of heater ducting is not in contract
  • info is not delivered on Monday, June 15 but came partially on June 16 and 17

As discussed

July 1, 2015

  • furniture doors - 17mm is OK
  • entrance hatch recess box - PUR insulated, put plywood panel in front
  • stair steps solid wood
  • cockpit sole - covered with cork 9mm
  • lining - leather panels are canceled
  • porthole boxes - yard makes tube, out of our delivery

June 16, 2015

  • black water tank - to be determined by Navyk, volume around 50 liter, position SB behind toilet

June 11,2015

  • tolerances
    • vertical:
      • sole to supporting structure - 0mm
      • ceiling to structure - 0mm
    • horizontal
      • clearance from inner frame contour - 20mm (space between frames is reserved for systems)
  • insulation type is PUR
  • grain orientation will be vertical
  • sole supports are alu tube 50x30x?
  • cabinet interiors to be white
  • KMY workshop facilities:
    • no veneer press
    • edge band machine for straight edges
    • lamello machine
    • round router bits R6, R8, R10, R12
  • Navyk will route the ducting for airheating through the interior
  • Navyk is free to use their own material naming
  • Navyk will give a price offer for the aluminium sole supports

Structure model - modifications!

  • Forepeak bulkhead - stiffeners will be on aft side (cabin side)
  • Pilothouse - between the windows will be a vertical T-profile with a web of 50x6 and a flange of 50x8
  • Entrance door forecabin - to be determined by Navyk, it will be a joinery door, not an aluminum door
  • sole structure - to be determined, Navyk will make a price offer for this