Difference between revisions of "Centralizer"
From NavykI
(New page: Futher development of the Systems matrix. The centralizer to be a listing (Excel) of all components required to build a boat. In short, the client describes or gives a drawing of the...) |
|||
Line 4: | Line 4: | ||
In short, the client describes or gives a drawing of the boat he wants and Navyk provides all required info for building/assembling this boat. | In short, the client describes or gives a drawing of the boat he wants and Navyk provides all required info for building/assembling this boat. | ||
+ | |||
+ | Our delivery will be: | ||
+ | *construction drawings incl. nesting | ||
+ | *outfitting drawings | ||
+ | *interior drawings incl. nesting | ||
+ | *system drawings: | ||
+ | **hydraulics | ||
+ | **electrics | ||
+ | |||
A complete delivery for purchase consists of purchase parts (engine, filters) and make parts (hull, shaft tube). | A complete delivery for purchase consists of purchase parts (engine, filters) and make parts (hull, shaft tube). | ||
Line 12: | Line 21: | ||
== Purchase list == | == Purchase list == | ||
*The centralizer generates a purchase list per supplier. | *The centralizer generates a purchase list per supplier. | ||
− | *Usually a boat comes in different versions with several options. In the program you give a build number and choose the version and desired options and then it creates a purchase list per supplier | + | *Usually a boat comes in different versions with several options. In the program you give a build number and choose the version and desired options and then it creates a purchase list per supplier, output in digital format (xls) or PDF. |
*The purchase list must be ready to send to the supplier for a price offer. | *The purchase list must be ready to send to the supplier for a price offer. | ||
*Further development is a purchase list for a number of boats, each with it's own configuration. | *Further development is a purchase list for a number of boats, each with it's own configuration. | ||
*Future development: link with client's warehouse adminstration | *Future development: link with client's warehouse adminstration | ||
+ | |||
[[Category: Developments]] [[Category: Systems]] | [[Category: Developments]] [[Category: Systems]] |
Revision as of 09:32, 18 February 2012
Futher development of the Systems matrix.
The centralizer to be a listing (Excel) of all components required to build a boat.
In short, the client describes or gives a drawing of the boat he wants and Navyk provides all required info for building/assembling this boat.
Our delivery will be:
- construction drawings incl. nesting
- outfitting drawings
- interior drawings incl. nesting
- system drawings:
- hydraulics
- electrics
A complete delivery for purchase consists of purchase parts (engine, filters) and make parts (hull, shaft tube).
Make parts consist of a drawing which indicates exactly what is to be done, it requires all info for making a price offer and producing the part. For a steel hull this means indicating the net and brut steel weight.
Purchase list
- The centralizer generates a purchase list per supplier.
- Usually a boat comes in different versions with several options. In the program you give a build number and choose the version and desired options and then it creates a purchase list per supplier, output in digital format (xls) or PDF.
- The purchase list must be ready to send to the supplier for a price offer.
- Further development is a purchase list for a number of boats, each with it's own configuration.
- Future development: link with client's warehouse adminstration