Description
Contacts
- client: Dick Alewijnse (NL) - DA is contactperson for all questions regarding systems
- project manager: Robin ten Hoope (NL) - RtH also drew up the interior since GDNP did not have time for it
- contact person GDNP: Erik Wassen (NL)
Classification
Scope
Drawing list
Time schedule
Trivia
- carbon mast costs about 250K which is more expensive than the interior (and the interior is more expensive than the aluminum construction)
- sistership 'Windhunter III' is build by Aluboot (Henk Borneman) and owned by Johan Mast
- ballast system with dumphatches is developed by Heine Deelstra from Gaastmeer Design, in cooperation with K&M Yachtbuilders
Questions
To do
Minutes of Meeting
06-09-2013
Dick Alewijnse, Erik Wassen, Robin ten Hoope
1 CONSTRUCTION
- A Keelconstruction/guides/stability trembling / nose through deck / with/without shell bulb
- One side plastic material on trunk, anodized guide part on keel
- Keel configuration and construction detailed and delivered by Dykstra
- Forward part of keel as high as possible, partially penetrating through deck
- Up/down movement speed 1m/min
- Cylinder pushes keel in lower position tight against shell, max. pressure to be definded (EW)
- In upper position the keel enters in the wedge shaped trunk which will secure the keel
- Bulb of casted lead (in mould)
- Internal a galvanized frame with threaded ends, mounted with galvanized nuts
- Between bulb and keel an isolating part which separates lead from aluminum
- Also the penetration of the threaded ends need to be isolated
- B Alustar
- NO ALUSTAR. Advantages do not outweigh the disadvantages of a yacht of this size.
- C Final shell stingers
- Stringers are OK as drawn by Navyk
- D Miscelaneous remarks/modifications of drawings
- Stairs in interior in way of trunk gearbox is not properly aligned, situation to be modified (RtH)
- When stairs is OK then optimize drive line by moving gearbox aftward, decrease distance engine-gearbox, if necessary make a small bulb in shell for gearbox (RtH / EW)
- Detail garage of entrance hatch in combination with scupper pipes (RtH)
- Define softpatch size and position, generator must be removable with engine in place (RtH)
- Add double plates and deck reinforcements (EW)
- What impact has relocating the PS ER bhd, how will be detailing of bathroom, how much free space requires the Turbo of the Steyr? (RtH)
- Indicate cockpit recesses, make proposal (RtH)
- Add additional pillars in way of F19 (mainsheet track) (RtH)
- E Penetrations/standpipes
- Determine position of standpipes for in and outlet, centralize as much as possible (RtH)
- F Dishwasher – modify recess
- Give Navyk new dimensions and position so this can be processed (RtH/EW)
- G Windows in aftside deckhouse
- To be determined in combination with interior and exterior sideview, make proposal for Dykstra approval (RtH)
- H Hatch sill entrance
- Not discussed, make proposal for Dykstra approval (RtH)
- I Porthole positions
- Pass new postions to Navyk so it can be updated in the construction plan (RtH)
- J Align PS ER bhd with cockpit seat
- What impact has relocating the PS ER bhd, how will be detailing of bathroom, how much free space requires the Turbo of the Steyr? (RtH)
- K WT doors relocated in BHD
- Determine new door type and position and inform Navyk (Rt)
- L Tanks ballast, fresh and grey. Discuss function and execution
- Situation unchanged
- M Motor position in relation with twindisc
- Twin disc is no option because of angle which requires too many couplings
2 DECK PLAN
- A Layout related to sailplan and sheeting, check
- Conform latest deckplan. Staysail to be drawn (EW, done 06-09-2013)
- B Sheeting/halyard angles to winches, check
- determine angles and heights for wich feeding (EW)
- C Complete equipment list
- check execution and delivery for hardware quotes (EW)
- strategic locations for fixed padeyes, upstands and footblocks (EW)
- add 2 deflection points for kite/code sheet to winch (EW)
- D Skylight salon, general details, constr. etc. (EW)
- skylight with dorade forward of F13 and extend glass 200m aft (RtH/EW)
- E Construction deckhouse, construction aluminum with wood, integrated windows, location additional pillars related to entrance, etc
- Dykstra will give principal details as a guide for the construction (EW)
- G Possibility of second travellercar on forward rail
- Extend foundation in deck for optional rail extension (EW)
- H Move fairlead to bollard
- Dykstra will move this (EW)
- I Entrance hatch principles
- Dykstra will give principle (EW)
3 SAIL PLAN
- A Raised forestay still possible with mast of Hall-spars?
- will influence current offer of Hallspars. New offer required based upon new built profile
- B Sail area to be checked, behaviour under different conditions
- Dykstra will make a new sailplan with all data given for price offer mast and hardware (EW)
4 INTERIOR
- A Interior drawings handed over to Dykstra for their approval
- drawings are handed over
5 MISCELANEOUS
- A What else Dykstra will do / finish?
- B Bowsprit
- Dykstra will set up bowsprit geometry with adjustable water stay (EW)
- C Fender storage in fore peak
- Alewijnse likes to store fenders in forepeak between hull and chainlocker, is this possible?
- Yes, see mail 06-09-2013 EW
- D Mainsheeting details
- details and geometry of system of run through deckhouse (EW)
- E No pulpit at bow
- drawings will be updated (EW)
- F weight estimation systems
- systems and positions arranged for weight calculation (RtH)
10 General arrangement
40 Construction
- frames will be all CNC
- bulb profiles changed into FB60x6
- deckhouse will be aluminium (by phone with Dykstra)
- bulkhead stiffening will be: vertical T50x50x5 and horizontal FB50x5 (wait for answer)
- shell division and as well other plate division will be made by Navyk (wait until a yard is chosen) (by phone with Dykstra)
- chain locker for anchor will be from aluminium 5mm (by phone with Dykstra)
- bow thruster construction will be finished by Navyk (by phone with Dykstra)
- plate under stairs iwo cockpit entrance will be as in the construction drawing (by phone with Dykstra)Changed
Liftkeel
- detailing might be done by Frans Brandjes
50 Outfitting
60 Systems
General
- overboards - all above WL
- overboards - combine as much as possible
- valves - reduce number of valves where possible
- drafting
- draw at scale 1:1
- scale in titleblock is 'NA' (not applicable)
- uniform use of symbols
- uniform size of symbols
- all tables grouped vertical in right side of drawing
- all on A2 format?
- use new titleblock / notes / table
- don't add unnecessary knucles in lines
- in the near future we should standarize symbols and draw the diagrams on a grid of 10x10
- use ball valve symbol instead of globe valve symbol
- use E for electric operated valves
- collect supplier data for each appliance (in the project folder there is not any documentation)
Ballastsystem Windhunter
- breather pipe must have sufficient diameter, Windhunter has Ø50 which is considered too small, they advice Ø80
- breatherpipes go to grills in aftside doghouse
- when breatherpipes overflow you know the tanks are full
- Goiot hatches operation lines are lead to the cockpit and have a 2:1 tackle
- Goiot hatcehs have a lever
- double bottom is used as cross over, K&M is not satisfied with (hard to make watertight, no inspection possible) and prefers 2 or 3 large diameter pipes
- Goiot deckhatch rectangular, for example 300x500 or 250x400, plexiglas replaced by aluminum panel
- advantage of using standard deckhatch is that spareparts like gaskets can be easily found and replaced
- Windhunter uses only ballastwater, we use a combination with grey water which gives smells so the breather pipe should be a closed ring?
Bilge
- manifold in galley (against trunk ER?), all manual valves well accessible
- draw breathers always in upper end of line
- seperate cross over from fill/suction line (saves 1 BIG manifold)
- calculate fill up/empty time for wing tank (verify cross sections of breather + cross over)
Fresh water
- note: wingtanks are not intended for storage because they heat up due to blue hull
- reduce number of valves
- toilets possibly come with double connections for FW / seawater, then no valve required, check this out (possible supplier is Raritan or Tecma)
- pumps, hydrofor, etc - to be removable: valves fore and aft
- add taps at low points
- reduce overboards by combining pipes
- use colors for hot (don't use 'warm') and cold water
- disconnect sea water tap galley from FW system
- calculate required time to fill up wingtanks with hydrophor
- breatherpipes wingtanks of sufficient diameter (calculate time required to empty/fill one tank?)
- breatherpipes wingtanks to keeltrunk?
- connect crossovers to bottom of wingtanks
- connect fill lines to sides of bottomtanks
- LS of HL as in bilge diagram?
questions / remarks SH
- Robin - bottom tanks - did we discuss about increasing the size or moving? Tank volumes shall not be increased
- cross over and breather section to be calculated (how much time it takes to move the water from PS to SB)
- fill - why via wingtanks? wingtanks should not be used for storage so fill should go directly to bottomtanks? DONE
- wing tanks - why drain? Now they are used also for storage, so drain is required
- wing tanks - why spare connection on top? Spare connection from wing tanks removed
- wing tanks - avoid that water drains through breather line
- wing tanks - extend fill line to near bottom to reduce noise?
- bottom tanks - why a valve in breather line? Removed
- watermaker - connect directly to bottom tanks only? Yes, wing tanks shall be filled from bottom tanks with the hydrophor
- cross over - always filled with water
- hot water to laundry machine? Laundry machine does not need hot water, only the dishwasher
Sea water
- galley - own faucet, no connection to FW faucet
Black water
- breather aft in transom, forward in mast?
Fuel
- pump does not require electric valves fore and aft
- Fuel transfer system has 20 l/min and 30 l/min flow rate for the pumps and 5 l/min for duplex filter. Should we put a bigger filter?
Electric
- generator - Northern Lights? Wisperpower company is running into troubles?
Propulsion
- Steyr 4 or 6 cylinder
- check out if 26" prop can be combined with Twindisc gearbox, because of space issue, ER trunk might require modification, together with interior engine/shaft angles can be modified, keep 30% tipdistance for propellor, longitudinal position can be modified
- propellor
- Flexofold 26" (optional 25" or 28", pending on engine and gearbox combination, issue is behaviour of sailing reverse)
- drawing of Twindisc is in e-mail of 22-07-2013