15038 Bestevaer 45 ST Pure

From NavykI
Revision as of 16:12, 16 July 2015 by 192.168.11.15 (talk) (General)

Jump to: navigation, search

'Pure' is the name of new line of yachts, of which the first boat is named 'Nescio'. This first boat will be build for Eeuwe Kooi himself (owner/director KMY).

Planning

  • Conform mail Willem Berends of July 16
  • WK 30 Navyk to implement all comments and changes.
  • WK 30 End of the week Navyk will send the draft files for review.
  • WK 32 Bamboo wood will be delivered to KMY for surface preparations.
  • WK 33 Until Wednesday Noon, KMY has the time to review and send some additional remarks.
  • WK 34 All wood material (exl. floor) will be deliverer at CNC works.
  • WK 34 End of this week Navyk will deliver the complete files to KMY.
  • WK 35 CNC will cut all materials en deliver to the KMY.

TO DO

General

  • access bolt connection for mounting superstructure
  • drill holes and notches for assembly
  • heating > add bulkhead penetrations for hose and grills
  • labels > create excel sheet with codes for each part

hatches and portlights

  • Deckhatches:
    • Lewmar Size 60 low profile: 39960030
    • Lewmar Size 30 low profile: 39930030
  • Portligths in superstructure:
  • Portlights in cockpit:

sole

  • margin boards width 70mm
  • hatches to be determined in combination with alu sole supporting structure

lining

  • V-grooves, every 100mm, parallel to deckline/sheer

ceilings

lockers

  • shelves > mounted with shelf supports (Hettich)
  • FYI > solid corner profiles in furniture plintes will be painted white

seats

  • seat cushion thickness 100mm
  • back vertical
  • seat panel 340mm above sole

berths

  • matrass thickness 100mm
  • bed slats 40 mm from Spacerflex

Fore Cabin

  • hatches in bed bottom > modify in way of batteries
  • hatches bow thruster > enlarge
  • shelf > add against FWD bulkhead, 300 deep, 650 from bed bottom
  • shelf > add against AFT bulkhead, in corner with lining (for phone, etc)
  • high lockers > move upper plinth outboard with 200mm
  • shelf locker > move side panel 100mm forward
  • porthole SB > relocate in middel of lining
  • porthole PS > relocate? KMY
  • shelf SB > rotate profile 10 degrees, move outboard to 10mm distance from vertical solid profile of shelf locker, make locker with doors under
  • bed > make bulkhead in storage, forward of batteries
  • bed > add bracket under each battery up to sole

Salon

  • pillar mast bulkhead > connected with FB 8mm, split mast bulkhead
  • table
  • chain plate reinforcement > mask
  • lower hinge in forward upper cabinet will be solved by KMY
  • counter top > raise 100mm
  • add shelf profile between upper lockers
  • box against FWD bhd > bottle storage, make narrower, add hatch in counter top (with fingerhole)
  • upper lockers > move upper plinth outboard

Galley

  • pillar behind removable side > to model
  • re-arrange front drawers to avoid collision with table
  • fridge > mvoe down, drawer above fridge
  • fridge > ventilation by holes in locker bottom next to plinth and holes in upper part of PS counter side (NO grill)
  • countertop > raise 50mm
  • shelf > add 1 or, if possible, 2 shelves between upperlockers. For spices, etc. Deep about 60mm and a high shelf profile of about 70mm
  • upper lockers > LED lights behind solid profile? KMY
  • drawers > use standard Hettich drawers where possible
  • drawers in galley fore side > various heights, top about 80mm, second drawer about 200, third drawer about 300
  • upper lockers > move upper plinth outboard
  • fridge is a Webasto
    • CR 85 EL - first choice
    • CR 65 EL - second choice
    • front to be white

Bathroom

  • material > panels can be normal HPL as rest of boat, the special quality W400-VV is canceled.
  • entrance door > rotates outside and forward
  • black water tank > behind toilet, 2 options:
  • glass doors > model schematic and indicate operation

Aft cabins

  • PS > bulkhead cutout, profiles, raise horizontal profile in line with sole deckhouse
  • bed bottoms > hatches for access storage space under, support?
  • lining > align knuckles with V-grooves
  • entrance door > rotates inside
  • technical space > add access hatches in longitudinal panels
  • high locker > add plinth on top, moved outboard

Deck house

  • 'pillar boxes' to be moved outboard 10mm
  • 'pillar boxes' add recesses for technical panels, dimensions? KMY
  • 'pillar boxes' pillar to model
  • all panels to be white, except for bench fronts, 'pillar boxes' besides entrance and top of guest cabin SB
  • bench fronts and top of guest cabin to be covered with 6mm bamboo as for entrance doors
  • add solid profiles around top of guest cabin.
  • WJ will provide correct model of entrance
  • add solid profiles at vertical corners of transition salon/guest cabin to deck house
  • stairs > add solid profile to vertical corner of lower step
  • recess behind seats > about 50 wide, 100 deep
  • lining besides entrance > add solid profile at vertical (skewed) corner
  • benches > seat width 550mm
  • benches > back inclinated
  • benches > raise bottom to have 950mm between seat and ceiling, this 950 is including or excluding the cushion? KMY
  • Aft cabin lining > reduce lost space behind lining
  • Stair steps > use for storage (3 steps)
  • Aft cabin top > removable plexiglass panel for light and air, detail? KMY
  • PS bench > remove armrest, make suitable for transverse seating
  • bed bottoms > raise 100mm for additional storage and wider matrass
  • bed bottoms > hinged hatch
  • bed PS > large drawer under
  • handrail SB > to model
  • handrail/pillar PS > to model

Sheet estimation

transverse grain

  • 17mm single bamboo - 3 sheets - bench fronts SL / galley front / table sides
  • 6mm single bamboo - 1 sheet - bench fronts DH

People

  • Eeuwe Kooi - director/owner (not directly involved)
  • Willem Berends - chain manger (responsible for contract)
  • Willem-Jan van der Vegt - engineer (our contactperson)
  • Haaie Andringa - foreman carpentry

Exchange work

  • KMY negotiated €1.000 discount for delivering a 3D model of interior - send file is only a block file
  • integration of heater ducting is not in contract
  • info is not delivered on Monday, June 15 but came partially on June 16 and 17

As discussed

July 1, 2015

  • furniture doors - 17mm is OK
  • entrance hatch recess box - PUR insulated, put plywood panel in front
  • stair steps solid wood
  • cockpit sole - covered with cork 9mm
  • lining - leather panels are canceled
  • porthole boxes - yard makes tube, out of our delivery

June 16, 2015

  • black water tank - to be determined by Navyk, volume around 50 liter, position SB behind toilet

June 11,2015

  • tolerances
    • vertical:
      • sole to supporting structure - 0mm
      • ceiling to structure - 0mm
    • horizontal
      • clearance from inner frame contour - 20mm (space between frames is reserved for systems)
  • insulation type is PUR
  • grain orientation will be vertical
  • sole supports are alu tube 50x30x?
  • cabinet interiors to be white
  • KMY workshop facilities:
    • no veneer press
    • edge band machine for straight edges
    • lamello machine
    • round router bits R6, R8, R10, R12
  • Navyk will route the ducting for airheating through the interior
  • Navyk is free to use their own material naming
  • Navyk will give a price offer for the aluminium sole supports

Structure model - modifications!

  • Forepeak bulkhead - stiffeners will be on aft side (cabin side)
  • Pilothouse - between the windows will be a vertical T-profile with a web of 50x6 and a flange of 50x8
  • Entrance door forecabin - to be determined by Navyk, it will be a joinery door, not an aluminum door
  • sole structure - to be determined, Navyk will make a price offer for this