Systems matrix

From NavykI
Revision as of 09:40, 18 February 2012 by 192.168.11.15 (talk)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

For a further development see Centralizer.

optimum engine room layout including optional equipment considering:

  • weight
  • routing
  • access
  • steel penetrations

furtermore

  • part list
  • 1 central file for all related info
  • gain a quick overview of required building kit penetrations
  • all required info for starting system engineering in SC


orderlist

  • per supplier for each part total quantity (by means of an automatic filter function?)