14004 Floatel

From NavykI
Revision as of 15:36, 12 February 2014 by 192.168.11.15 (talk) (Scope)

Jump to: navigation, search

General

  • yard budget for developing and building 1st hull €35.000 (Floating 44 was €20.000, Comforship was €40.000 (done by Michiel van Vossen))
  • Material - aluminum
  • CE Category C (required by marina's)
  • floating hotel room, will never leave it's berth after mooring
  • Hull - as cheap as possbile to produce (combination of smart engineering, material reduction and labor reduction)
  • Floating 44 (project 13006):
    • displacement 14 tons
    • floating at DWL
    • trim aft 40mm
    • transverse cross stiffeners removed
    • see dwg P:\Offers\14004 Houseboat\Final draw


Scope

  • NA/calculations (total 128h)
    • hydrostatics/weight estimation(interpolation/construction) (40h)
    • intact stability (16h)
    • damaged stability (32h)
    • roof strength (24h)
    • glass thickness (8h)
    • frame strength (8h)
  • ME (total 132h)
    • building kit (120h)
    • additional construction details (12h)

Additional

  • 7 superstructure frames (5 onder, 2 boven)
  • hatch hull
  • NO railing
  • NO stairs interior
  • NO stairs exterior
  • NO 'kraaiennest'
  • bridge connection
  • calculate influence of filled whirlpool on heel

Meeting notes

  • Peter will inform if boat needs to be sailing or not for CE approval
  • BOA 4980mm for roadtransport (including wooden sideplanking)
  • sceptic tank Afmitech Bever Combi Compact
    • contact person Jan Boede de Jong
    • tank W2200 (possibly W2000) to be fitted between hulls, as far aft as possible
    • bench and bathing platform to be removable for this purpose
    • hull fixtures by Navyk
  • insulated and heated drain hose for whirlpool Ø80mm
  • Dual Docker removable mounting plates by Navyk
  • removable cleats by Navyk (see pictures)
  • wooden planking
    • Lariks 28mm
    • beams H60mm
  • bathing area in front of bench
    • alu grills on alu structure
    • grills tbd by Linskens

hull construction

  • bended sheets 3x2m
  • on top 21mm wide flanges
  • bottom slightly rounded for additional stifness (10mm)
  • bow
    • rectangular in planview
    • sloped in sideview
  • all tubes rectangular 120x60
  • cut out in tubes for draining rainwater from deck
  • 70mm distance between platform beams and deck
  • NO double transom (Floating 44)
  • technical space
    • in SB hull
    • access hatch CO 500x500
    • space position by Niels
  • pipe through hull in way of whirlpool for drainpipe?
  • bridge connection
  • top of wooden planking in line with interior sole

house

  • roof of sandwich panel (Kingspan Unidek):
    • 10mm OSB
    • 160mm ESP / wooden beams at 450 COC
    • 10mm OSB
    • maximum panel length 8500
    • beams are in longitudinal direction
  • side walls
  • load for strength calculation to be determined by Linskens