- Goal is to reduce costs of labour and/or material with € 4.000 minimum.
- FEM calculations for the following:
- hulls
- existing hull in 3mm
- existing hull in 3mm with deck 2mm
- existing hull in 3mm with reduced number of watertight bulkheads and with PUR foam
- circular hull in 3mm
- circular hull in 3mm with reduced number of watertight bulkheads and with PUR foam
- platform
- beams with 3mm wall thickness
- reduced number of beams with 3mm wall thickness
- for circular hull:
- maintain platform height
- vary draft
- CE-conformity