New project - SC 2005
From NavykI
Creating a new SC2005 project
- 1.ShipConstructor/Project/New Project and fill up the window:
- Project name = KP project code without additional description.09001(1 unit )or 09001-U1(01) (more than 1 unit.
- Folder- check Create
- Destination Folder:P/Project name/Drawings
- ShipConstructor Template Project File:Browse to H:\ShipConstructor\Project Template\Aluminium or steel *pro file or browse to P:\Project/drawings/*.pro
- Check <View frames from aft>
- Administrator Login
- Username: Default
- Password: No entry
- 2.Open new unit drawing:ex U1 or 01
- 3.Click ShipConstructor/Run Manager/Settings/Project/Reports
- Company name: KP
- Project name:KP project code
- Project desc: project description
- 4.in Unit dwg,structure template and nest template (via navigator) set up:
units
text style
- Text height (scale 1:1)
- plain text - 2.5 dimensions, profile types, etc.
- subtitles in CAPITALS - 3.5 SECTION C-C, DETAIL A
- titles in CAPITALS - 5.0 FRAME 04, LG 5000P
leader settings [command: le s]
lts:50
- 5.Manager/Library - clean library of the not used stocks and update it with stocks,endcuts,finishes, materials to be used and add stock plate for plate and profiles.
Setting ShipConstructor Manager[edit]
The tabs ‘Pipe Colors’, ‘HVAC Colors’ and Tag Numbers are of no importance for the time being.