Difference between revisions of "General construction plan - small craft"

From NavykI
Jump to: navigation, search
Line 5: Line 5:
 
**tank capacities?
 
**tank capacities?
  
Indicate all that is excluded from the delivery ('by yard').
+
*Indicate all that is excluded from the delivery ('by yard').
 
+
*Longitudinal structure is specified in longitudinal views, transverse structure is specified in frames.
Longitudinal structure is specified in longitudinal views, transverse structure is specified in frames.
+
*At intersections of longitudinal and transverse construction indicate which one continues.
At intersections of longitudinal and transverse construction indicate which one continues.
+
*Make standard details for scallops, limber holes, breather holes, etc.
 
 
  
 
[[Category: Drafting]][[Category: Marine Engineering]] [[Category: Naval Architecture]]
 
[[Category: Drafting]][[Category: Marine Engineering]] [[Category: Naval Architecture]]

Revision as of 12:38, 27 January 2011

  • Table:
    • principal scantlings
    • drive train: engine, reduction box, thruster bearing
    • rudder shaft installation: supplier / by yard
    • tank capacities?
  • Indicate all that is excluded from the delivery ('by yard').
  • Longitudinal structure is specified in longitudinal views, transverse structure is specified in frames.
  • At intersections of longitudinal and transverse construction indicate which one continues.
  • Make standard details for scallops, limber holes, breather holes, etc.