Difference between revisions of "General construction plan - small craft"

From NavykI
Jump to: navigation, search
(Outfitting)
(Outfitting)
Line 72: Line 72:
 
*thruster bearing plate
 
*thruster bearing plate
 
*shaft installation
 
*shaft installation
*thrusters (bow and stern) - show transversal section over thruster with tunnel lengths
+
*thrusters (bow and stern) - indicate maximum tunnel pipe length, for knuckled thruster tunnels show section with tube lengths
 
*deck drains
 
*deck drains
 
*anchor arrangement
 
*anchor arrangement

Revision as of 11:45, 1 February 2012

General

  • indicate what is not in delivery or what is yard delivery
  • keep constructions simple
  • use as little different plate thicknesses and profile sections as possible
  • draw schematic
  • do NOT:
    • insert SC planar groups
    • use lines of Rhino solid model

Tables

  • principal dimensions:
    • Loa
    • Lhull
    • Lwl
    • Boa
    • Bwl
    • Draft
    • Displacement
    • CE category
    • hull speed
  • construction:
    • material properties
    • classification
    • principal scantlings
  • drive train
    • engine
    • reduction box
    • thruster bearing
    • shaft details?
    • propellor details?
  • tank table

Shell

  • specify shell thickness in views scale 1:50:
    • side
    • top

Structure

  • principal frames
  • bulkheads (WT bulkheads to be mentioned in frame title)
  • webframes (mention in frame title)
  • transom view
  • centerline section OR side view
  • bottom view
  • deck view
  • specify structure only 1 time:
    • longitudinal structure in longitudinal views
    • transverse structure in transverse views
  • indicate:
    • continuing structure (arrows)
    • profile snipes

Cut outs

  • for every cut out
    • location
    • dimensions
    • mark with crossed lines, linetype 'center'
  • hatches and portholes:
    • brand, model, HIP
  • engine ventilation grill

Outfitting

  • rudder construction
  • rudder shaft installation
  • steering system (cylinder support)
  • engine girders
  • thruster bearing plate
  • shaft installation
  • thrusters (bow and stern) - indicate maximum tunnel pipe length, for knuckled thruster tunnels show section with tube lengths
  • deck drains
  • anchor arrangement
  • bilge water collection point
  • specify any equipment part which influences the delivery
  • save data sheets of all used equipment in inbox
  • make standard details for scallops, limber holes, breather holes, etc.