Difference between revisions of "12023 DMT office"

From NavykI
Jump to: navigation, search
(70 Interior)
(70 Interior)
Line 127: Line 127:
  
 
*Materials:
 
*Materials:
from Holver - 021.40.79.400 (Bucharest number)
+
from Holver - 021.407.94.05 (mr Andrei Dumitrache)
 +
*Poplar plywood - 4/8/15/18 mm thickness - 2520 x 1720
 +
*Birch plywood - 15/18 mm thickness - 2520 x 1720
 +
*Ceiba plywood - 4/8/15/18 mm thickness - 2500 x 1700
 +
*(flexible) Ceiba plywood 8 mm - 2500 x 1220 / 1220 x 2500
  
 
== 80 To solve for next meeting ==
 
== 80 To solve for next meeting ==

Revision as of 14:25, 20 March 2013

General

Description

  • Classic bar for office lounge of DMT

Contacts

Classification

Scope

Drawing list

Time schedule

Questions

20.02.2013 - 1st Meeting summary

BAR USAGE/PURPOSE OF ROOM

  • small group meetings
  • informal meetings
  • Guests meetings
  • Tendency for a sport Cafe - looking on TV at Football games for example

AMBIENT:

  • Ambient of an Irish bar, with solid wood on floor, dim lights (reflected on ceiling - indirect lighting).
  • Wood on walls up to the height of the bar, standing tables,
  • Bar construction and style - same as on Albatros boat -off white panels with wood
  • Corian for the top of the bar
  • Hardware - brass
  • Certain parts of the walls to be covered with wood,
  • A 200 mm plate all the way of the walls, for placing glasses - the height to allow supporting your elbow -
  • The tables and stools to be movable around the room
  • Chairs with backrest

APPLIANCES:

  • good quality
  • Romanian supplier will be OK
  • Beer pump - for 2 kinds of beer - under the pump the drums
  • Icemaker
  • 2 door coolers
  • Espresso machine - semi professional one
  • Liquor up side down - supports
  • Glass supports - wire
  • NO dishwasher (will be available in pantry near staircase)

OTHERS:

  • Think for space division - glasses, cleaning utilitites, storage for stuff (peanuts, cofee, sugar), trash can)
  • HVAC by Heinen & Hopman - contact person is Juliana (07-44153448)
  • audio and video by Retec - contactperson is Andrei
  • 2 TV's
  • Ceiling's Height 3.30 m / Beams 3.50
  • windows:
    • glass anthracite (grayish)
    • exterior sun protection
    • no curtains
  • office interior colours:
    • shades of anthracite
    • curtains 'sand'

To do

  • basic 3D impression of space with:
    • bar
    • bar stools
    • stand up tables
    • recessed ceiling?
  • bar to contain the following:
    • fridges
    • icemaker
    • beerpump
    • rinsing sink
    • in way of glass cabinet an extended lower ceiling for spotlights?
  • price offers for:
    • 3D rendering detailed
    • workshop drawings
    • bill of materials
  • Lindr
  • beerpumps
  • biertapwinkel

40 Construction

50 Outfitting

60 Systems

70 Interior

Home


  • Wardrobe entrance room:
    • modern design
    • full hight
    • 3 doors open and 1 door fake
    • entrance wall/piller cover -to look one part with the woardrobe
    • interior divided in two parts
      • one part electrical systems with shelves
      • second part wardrob
        • hangers
        • upper part one shelf
        • lower part space for boots and shoes
    • in upper part of the piller two ventilation grills
    • entrance wall heating sistem built-in
    • hidden hardware
    • the doors whithout knob,push system,can be sliding doors or a similat system
  • Wardrobe bedroom:
    • modern design
    • full hight
    • 3 sliding doors
    • the door near window with mirror


  • Materials:

from Holver - 021.407.94.05 (mr Andrei Dumitrache)

  • Poplar plywood - 4/8/15/18 mm thickness - 2520 x 1720
  • Birch plywood - 15/18 mm thickness - 2520 x 1720
  • Ceiba plywood - 4/8/15/18 mm thickness - 2500 x 1700
  • (flexible) Ceiba plywood 8 mm - 2500 x 1220 / 1220 x 2500

80 To solve for next meeting

  • check positioning and dimensions for air vents in the pillar
  • check accurate distance for the sockets - there are 2 pictures showing different measurements
  • need depth of the NEXTRA equipment (single equipment on wall with window - have to see if it is more than 100 mm

also check the cables under it

  • measure accurately, the positioning of the equipment on the wall (LxWxD) - also the electric and cable sockets
  • dimension for hole near D-Link equipment - see what's for the cable going out of it.
  • dimension the server and Huawei HUB on the boxes (LxWxD)