Difference between revisions of "15038 Bestevaer 45 ST Pure"

From NavykI
Jump to: navigation, search
(Milling)
(Remarks milling)
 
(6 intermediate revisions by the same user not shown)
Line 25: Line 25:
 
===Parts===
 
===Parts===
 
*one side veneer > add 'top veneer' or 'bottom veneer' to part label? (for milling operator)
 
*one side veneer > add 'top veneer' or 'bottom veneer' to part label? (for milling operator)
 +
 +
===Issues and mistakes===
 +
*panel thickness tolerance > larger than 1mm > resulting in many gaps > Kuiper did not deliver sanded/calibrated panels
 +
*deckhouse
 +
**lining > window cutouts > offset is made outside instead of inside
 +
**lining > aft wall (SU-01-09) > window cutout has moved (SU-01-07 is okay)
  
 
===Solid model===
 
===Solid model===
Line 69: Line 75:
  
 
==Navyk remarks for KMY==
 
==Navyk remarks for KMY==
====General====
 
*push button > knob can be rotated 90° or 180°?
 
*heating
 
**outlets > HIP?
 
**accesoires?
 
  
 
==INFO==
 
==INFO==
Line 193: Line 194:
 
==Milling==
 
==Milling==
 
*Subcontracted to [[CNCwerk]]
 
*Subcontracted to [[CNCwerk]]
 +
===Remarks milling===
 +
*drill holes > not drilled (overlooked, only the crosshairs on no process layer were noticed and removed)
 +
*panel thickness > varies from 15.3 - 17mm
  
 
==Aluminum==
 
==Aluminum==
Line 206: Line 210:
 
*Willem-Jan van der Vegt - engineer (our contactperson)
 
*Willem-Jan van der Vegt - engineer (our contactperson)
 
*Haaie Andringa - foreman carpentry
 
*Haaie Andringa - foreman carpentry
 +
*Oscar - freelance carpenter
  
 
== Exchange work ==
 
== Exchange work ==
Line 211: Line 216:
 
*integration of heater ducting is not in contract
 
*integration of heater ducting is not in contract
 
*info is not delivered on Monday, June 15 but came partially on June 16 and 17
 
*info is not delivered on Monday, June 15 but came partially on June 16 and 17
 +
*4 hours for renesting 12mm in smaller sheet (not confirmed by Willem yet)
  
 
== As discussed ==
 
== As discussed ==

Latest revision as of 14:54, 30 October 2015

'Pure' is the name of new line of yachts, of which the first boat is named 'Nescio'. This first boat will be build for Eeuwe Kooi himself (owner/director KMY).

Scope[edit]

  • detailed 3D model
  • general detail sheet
  • CNC milling files (for all panel parts, drill holes not included)
  • assembly drawings (with indication for bevels)
  • list of hardware (98 assembly screws 4.5x30)
  • list of appliances
  • list of mouldings ('lijstenstaat')
  • weight brut + net + COG

Planning[edit]

  • Conform mail Willem Berends of July 16
  • WK 30 Navyk to implement all comments and changes.
  • WK 30 End of the week Navyk will send the draft files for review.
  • WK 32 Bamboo wood will be delivered to KMY for surface preparations.
  • WK 33 Until Wednesday Noon, KMY has the time to review and send some additional remarks.
  • WK 34 All wood material (exl. floor) will be deliverer at CNC works.
  • WK 34 End of this week Navyk will deliver the complete files to KMY.
  • WK 35 CNC will cut all materials en deliver to the KMY.

TO DO[edit]

Parts[edit]

  • one side veneer > add 'top veneer' or 'bottom veneer' to part label? (for milling operator)

Issues and mistakes[edit]

  • panel thickness tolerance > larger than 1mm > resulting in many gaps > Kuiper did not deliver sanded/calibrated panels
  • deckhouse
    • lining > window cutouts > offset is made outside instead of inside
    • lining > aft wall (SU-01-09) > window cutout has moved (SU-01-07 is okay)

Solid model[edit]

General[edit]

  • Toilet outlet > route (?)

Sole[edit]

FINAL

Forecabin[edit]

FINAL

Salon[edit]

FINAL

Galley[edit]

FINAL

Bathroom[edit]

FINAL except for wooden rims upper lockers (to be added)

Aft ship[edit]

FINAL

Superstructure[edit]

FINAL

Sole structure[edit]

  • finalize (after approval of KMY)

Other files[edit]

  • labels > create excel sheet with codes for each part
  • additional files:
    • Marlan templates
    • Metal parts (?):
      • handrails
        • galley
        • SB > to model
        • PS > to model

Overlength[edit]

  • 10mm at bulkheads which connect to superstructure
  • 5mm at inside contour of base ceiling hull (where it connects to superstructure lining)

Navyk remarks for KMY[edit]

INFO[edit]

General[edit]

  • driver-drill
    • total length including bit > 210mm
    • distance shaft center to top of housing > 36mm

hatches and portlights[edit]

  • Deckhatches:
    • Lewmar Size 60 low profile: 39960030
    • Lewmar Size 30 low profile: 39930030
  • Portligths in superstructure:
  • Portlights in cockpit:

hardware[edit]

  • finish > stainless steel

lining[edit]

  • V-grooves, every 100mm, parallel to deckline/sheer

ceilings[edit]

entrance doors[edit]

  • door width net standard > 560mm
  • door width net minimum > 500mm
  • gap under door > ?
  • core > plywood ocoume 18mm
  • cover panels > plywood bamboo 7mm
  • hinges?
  • mortise lock?
  • handles?
  • door plates/shields?
  • height doorhandles?
  • door catch?
  • ajar hook?

lockers[edit]

  • shelves > mounted with shelf supports (Hettich)
  • FYI > solid corner profiles in furniture plintes will be painted white
  • hinges > Hettich Intermat Soft....
  • drawer runners > Hettich Quadro 30
  • closing device > Kroon 372369
  • shelf supports

seats[edit]

  • seat cushion thickness 100mm
  • back vertical
  • seat panel 340mm above sole

berths[edit]

  • matrass thickness 100mm
  • bed slats 40 mm from Spacerflex

Sole[edit]

  • base > 18mm ocoume, varnished all around
  • finish > chest nut
  • margin boards > width 70mm
  • hatch locking device > see material list

Fore Cabin[edit]

Salon[edit]

Galley[edit]

Bathroom[edit]

Aft cabins[edit]

  • entrance door > rotates inside

Deck house[edit]

Superstructure[edit]

  • Skyscreen
    • type Roller Surface 2 With Seal
    • orientation is transverse sliding

Modeling refereneces[edit]

Tolerance[edit]

  • distance to frame flanges 20

Lining[edit]

  • deckhouse > offset 62 from inside shell, lining will be glued against Hora windowframes conform P169 Detail windows.dwg (received June 30)

Base ceiling[edit]

  • superstructure
    • offset 58 from inside shell
    • after rebuilding salon tolerance <7 (surface from aft bulkhead to fwd bulkhead)
    • interference with stringers <2, to be solved on board

Sheet estimation[edit]

transverse grain[edit]

  • 17mm single bamboo - 3 sheets - bench fronts SL / galley front / table sides
  • 6mm single bamboo - 1 sheet - bench fronts DH

Milling[edit]

Remarks milling[edit]

  • drill holes > not drilled (overlooked, only the crosshairs on no process layer were noticed and removed)
  • panel thickness > varies from 15.3 - 17mm

Aluminum[edit]

  • mast bulkhead > bolted? requires hatch in bed
  • mast bulkhead > cutout entrance door + heater hose
  • aft bulkhead > cutout for heater hose
  • galley > pillar
  • bolt connection > create detail

People[edit]

  • Eeuwe Kooi - director/owner (not directly involved)
  • Willem Berends - chain manger (responsible for contract)
  • Willem-Jan van der Vegt - engineer (our contactperson)
  • Haaie Andringa - foreman carpentry
  • Oscar - freelance carpenter

Exchange work[edit]

  • KMY negotiated €1.000 discount for delivering a 3D model of interior - send file is only a block file
  • integration of heater ducting is not in contract
  • info is not delivered on Monday, June 15 but came partially on June 16 and 17
  • 4 hours for renesting 12mm in smaller sheet (not confirmed by Willem yet)

As discussed[edit]

July 1, 2015[edit]

  • furniture doors - 17mm is OK
  • entrance hatch recess box - PUR insulated, put plywood panel in front
  • stair steps solid wood
  • cockpit sole - covered with cork 9mm
  • lining - leather panels are canceled
  • porthole boxes - yard makes tube, out of our delivery

June 16, 2015[edit]

  • black water tank - to be determined by Navyk, volume around 50 liter, position SB behind toilet

June 11,2015[edit]

  • tolerances
    • vertical:
      • sole to supporting structure - 0mm
      • ceiling to structure - 0mm
    • horizontal
      • clearance from inner frame contour - 20mm (space between frames is reserved for systems)
  • insulation type is PUR
  • grain orientation will be vertical
  • sole supports are alu tube 50x30x?
  • cabinet interiors to be white
  • KMY workshop facilities:
    • no veneer press
    • edge band machine for straight edges
    • lamello machine
    • round router bits R6, R8, R10, R12
  • Navyk will route the ducting for airheating through the interior
  • Navyk is free to use their own material naming
  • Navyk will give a price offer for the aluminium sole supports

Structure model - modifications![edit]

  • Forepeak bulkhead - stiffeners will be on aft side (cabin side)
  • Pilothouse - between the windows will be a vertical T-profile with a web of 50x6 and a flange of 50x8
  • Entrance door forecabin - to be determined by Navyk, it will be a joinery door, not an aluminum door
  • sole structure - to be determined, Navyk will make a price offer for this