Difference between revisions of "General construction plan - small craft"
From NavykI
Line 5: | Line 5: | ||
**tank capacities? | **tank capacities? | ||
− | Indicate all that is excluded from the delivery ('by yard'). | + | *Indicate all that is excluded from the delivery ('by yard'). |
− | + | *Longitudinal structure is specified in longitudinal views, transverse structure is specified in frames. | |
− | Longitudinal structure is specified in longitudinal views, transverse structure is specified in frames. | + | *At intersections of longitudinal and transverse construction indicate which one continues. |
− | At intersections of longitudinal and transverse construction indicate which one continues. | + | *Make standard details for scallops, limber holes, breather holes, etc. |
− | |||
[[Category: Drafting]][[Category: Marine Engineering]] [[Category: Naval Architecture]] | [[Category: Drafting]][[Category: Marine Engineering]] [[Category: Naval Architecture]] |
Revision as of 12:38, 27 January 2011
- Table:
- principal scantlings
- drive train: engine, reduction box, thruster bearing
- rudder shaft installation: supplier / by yard
- tank capacities?
- Indicate all that is excluded from the delivery ('by yard').
- Longitudinal structure is specified in longitudinal views, transverse structure is specified in frames.
- At intersections of longitudinal and transverse construction indicate which one continues.
- Make standard details for scallops, limber holes, breather holes, etc.