Difference between revisions of "General construction plan - small craft"
From NavykI
Line 6: | Line 6: | ||
Indicate all that is excluded from the delivery ('by yard'). | Indicate all that is excluded from the delivery ('by yard'). | ||
+ | |||
+ | |||
+ | [[Marine Engineering]] [[Category: Naval Architecture]] |
Revision as of 16:35, 30 November 2010
- Table:
- principal scantlings
- drive train: engine, reduction box, thruster bearing
- rudder shaft installation: supplier / by yard
- tank capacities?
Indicate all that is excluded from the delivery ('by yard').