15007 Bestevaer 45 ST Jongedame

From NavykI
Revision as of 16:23, 11 September 2015 by 192.168.11.33 (talk) (walls&lining)

Jump to: navigation, search

'Pure' is the name of new line of yachts, of which the first boat is named 'Nescio'. This first boat will be build for Eeuwe Kooi himself (owner/director KMY).

Scope

  • detailed 3D model
  • general detail sheet
  • CNC milling files (for all panel parts, drill holes not included)
  • assembly drawings (with indication for bevels & edgeband)
  • list of hardware & appliances
  • weight brut + net + COG

Planning

  • Delivery W47

TO DO

Parts

Solid model

General

Sole

Base sole primary model done

Forecabin

Salon

Galley

Bathroom

Aft ship

Superstructure

Sole structure

Other files

Overlength

Navyk remarks for KMY

General

    • outlets > HIP?

INFO

General

  • driver-drill
    • total length including bit > 210mm
    • distance shaft center to top of housing > 36mm

hatches and portlights

  • Deckhatches:
    • Lewmar Size 60 low profile: 39960030
  • Portligths in superstructure:
  • Portlights in cockpit:

hardware

lining

  • can be with knuckles, minimum width 300mm

ceilings

  • White HPL panels
  • lighting > EB12/EB/22?flex-05

entrance doors

lockers

seats

  • seat cushion thickness 120?
  • back vertical ?

berths

  • matrass thickness 120mm
  • holes in bed panel

Sole

  • base > 18mm ocoume, varnished all around
  • finish > Teak veneer: Bruynzel Decora Sole Flooring - T.B.D.
  • margin boards > no margin boards
  • hatch locking device > Southco E5-70-1627-701 + Southco E3-13-4

Fore Cabin

  • storage access from top & side

Salon

Galley

Bathroom

  • without sink
  • shower mixer > T.B.D.
  • shower head > T.B.D.

Aft cabins

  • entrance door > sliding door system Hasky 100
  • boiler under bed

Deck house

  • detailed metal construction for 'laptop tables' aft PS&SB
  • hardware folding footrest aft PS&SB - T.B.D.

Superstructure

  • Skyscreen
    • type Roller Surface 2 With Seal
    • orientation is transverse sliding

Modeling refereneces

Tolerance

  • distance to frame flanges 20

Lining

  • deckhouse > offset 62 from inside shell, lining will be glued against Hora windowframes conform P169 Detail windows.dwg (received June 30)

Base ceiling

  • superstructure
    • offset 58 from inside shell
    • after rebuilding salon tolerance <7 (surface from aft bulkhead to fwd bulkhead)
    • interference with stringers <2, to be solved on board

Sheet estimation

Milling

Aluminum

  • mast bulkhead > cutout entrance door + heater hose
  • aft bulkhead > cutout for heater hose
  • bolt connection > create detail

People

  • Eeuwe Kooi - director/owner (not directly involved)
  • Willem Berends - chain manger (responsible for contract)
  • Willem-Jan van der Vegt - engineer (our contactperson)
  • Haaie Andringa - foreman carpentry

Exchange work

As discussed

Structure model - modifications!